Please click on link to access each file.

TENANT'S REQUIREMENTS

 

VOLUME 1

 

Changes (referred to in Appendix I of Volume 1)

 

 

- Change No.13 18/09/08 (ref: Installation of Computer Network)

 

 

- Change No.14 01/10/08 (ref: Bar Cafe Lighting Design)

 

 

- Change No.15 28/01/09 (ref: Additional PDQ to Bar)

- Change No. 22 10/06/09 (ref: Revised Headboard Reading Light)

- Change No. 23 10/06/09 (ref: Walker Modular bathroom Pod)

- - Sanitaryware Schedule 07-05-09

- Change No. 24 08/09/08 (ref: Juice Machines)

- Change No. 26 26/08/09 Riser Door Locks

- Change No. 27 23/09/09 New Kitchen Supplier

- Change No.28 02/11/09 Call Point Cover

- Change No.29 05/11/09 Liftshaft Finishes

- Change No.30 13/11/09 Walker Modular Bathroom Pods

 

 

 

 

VOLUME 2 - (Design / Construction Guidelines (May 2008))

 

 

- PDF (Complete Document)

 

 

- Drawings (Index Page)

 

 

- Reference Schedules

- Record of Changes to Design / Construction Guidelines
---- 1
---- 2 (May 2008)

 

VOLUME 3 - (Mechanical & Electrical and Pulic Health Standards Specification (revison 10 August 2007))

 

 

This disk may have automatically launched when the disk was loaded in the disk drive (via autorun.inf file).
To access the individual files in explorer: shut down this window, go to my computer to access the disk drive hold down ctrl key and right click on disk icon select open or explore from the pop up menu.